返回创作者库
MLMatt Loszak | Aalo Atomics

Matt Loszak | Aalo Atomics

@MattLoszak
科技与产品英文成长创作者 (1千–3万)收录于 2026-11-26

Aalo Atomics联合创始人兼CEO,建设批量制造核电站,并分享反应堆经济性与工厂进展。

Cofounder & CEO @AaloAtomics. Building mass-manufactured nuclear plants to help maximize quality of life for all humans

粉丝规模
2.9万
关注 108
日常浏览中位数
3.9千
30天 9条7日 2帖
收藏率
0.1%
赞率 1.3%互动 1.6%
网络权威分
43/ 100
30 天黑马爆款
2
最高 124.1×
曝光效率日常浏览 / 粉丝数成长创作者 (1千–3万)
日常浏览 ≈ 粉丝数 14%·▲ 同量级中位 24%0.6×
0%▲

近 3 天粉丝成长曲线

移动鼠标查看每日粉丝变化

近 3 天变化
-71(-0.2%)
28,65028,60028,55028,50011-2611-2811-29

近 14 周发文节奏

2026-11-28 周六1 条
14 周推文
28
活跃发文日
25/64
活跃周数
10/10
周均产出
3.1
单日峰值
3
高频星期
周一
8月10月11月一三五日
08-24 → 11-29
少多
公开互动圈12
关注 9 · 转发 1 · 引用 1
转发
5×
引用
3×
提及
2×
关注
1×
关注
1×
关注
1×
被头部创作者关注 / 背书10
关注 9 · 引用 1
最高倍率124.1×
单帖最高浏览48万
最高收藏率0.4%
MLMatt Loszak | Aalo Atomics
Matt Loszak | Aalo Atomics@MattLoszak科技与产品2.9万粉en
日常 3.9千

Very excited to announce that at 12:20am on the 4th of July, Aalo achieved criticality on our first full-scale reactor.

We cut it close, but we pulled it off!!

Working towards this goal with such an incredible group of humans has been the most fulfilling period of my life. This moment has been three years in the making.

Last year, Executive Order 14301 called for at least three new reactors to go critical before July 4th, 2026.

As of late last Friday night, that goal has been surpassed!

When the EO was announced, we immediately sat down to figure out what the most ambitious scope would be, while still being potentially achievable by July 4th.

Some of the team proposed doing simplified designs with smaller fuel loads, or building in existing facilities.

One thing was clear: We wouldn't have time to integrate a full-scale sodium heat-removal loop to bring the reactor to its full 30 MWt.

So here’s where we landed:

➡️ We purchased the entire commercial-scale fuel load. This is enough fuel to operate at 30 MWt / 10 MWe for 3 years before refueling. To my knowledge, it’s the largest fuel load that’s been taken critical in the DOE pilot program, by far.

➡️ We built a full-scale reactor vessel in our factory, and loaded in our commercial graphite layout. All the dimensions, vessel thickness, and manufacturing techniques are essentially the same as we will use for the imminent commercial version. There will be a few minor tweaks for sodium flow and full-power, but nothing major.

➡️ We built an entirely new reactor facility at the Idaho National Lab. Building a building is easy. Building a new reactor facility comes with a mountain of paperwork, policies, operation and training procedures, security, instrumentation and control, and more.

Zero-power criticality might seem like a small step, but I can tell you, going through the exercise of building a reactor and taking it to criticality has been extremely valuable.

The learnings on regulatory, ops, manufacturing, supply chain, QA, economics, engineering, and design will accelerate our path through to the final iteration at full-power.

America is blessed to have a recent Cambrian explosion of startups in nuclear, all going after different markets, technologies, and strategies.

I’m excited that sodium, gas, salt, and new PWRs are all getting pushed forward once again. The best outcome for humanity is to have all these advance in parallel, as quickly as possible, while maintaining safety.

Thanks again to our amazing team, DOE, INL, BEA, and everyone else who helped us get to where we are today.

This could not have happened anywhere else. Happy birthday, America!! 🇺🇸🇺🇸🇺🇸

There has never been a better time for nuclear energy. The Second Atomic Age has begun, and this one will be here to stay.

48万294(0.1%)2.2千268134
X 原帖
MLMatt Loszak | Aalo Atomics
Matt Loszak | Aalo Atomics@MattLoszak科技与产品2.9万粉en
日常 3.9千

BTW, Aalo only spent around $100M total to get to criticality.

That includes our full-scale fuel load, full-scale reactor (no sodium), factory and its machinery, all payroll, regulatory fees, etc. Everything.

The people who told you nuclear has to be expensive are wrong.

3.6万66(0.2%)1.1千11343
X 原帖
MLMatt Loszak | Aalo Atomics
Matt Loszak | Aalo Atomics@MattLoszak科技与产品2.9万粉en
日常 3.9千

If you run the numbers on Cybercab, the potential really is insane.

Fare revenue could be bigger than all their car sales combined. Maybe even bigger than Amazon.

First, for a city like Austin, how many Cybercabs would it take to cover today's ride-share demand?

Around 2,000, to hit consistent 2-minute pickups.

Ok, that's given today's demand, but Cybercab could create entirely new consumer behavior.

It may end up getting priced MUCH cheaper than uber, has a more consistent & private experience, you could do email or watch Netflix on your way to and from work, etc.

So what would happen if people started commuting with it, and using it instead of their car on most trips...

Around 50,000 cars would do the trick.

How does this compare to the number of cars on the road in Austin today?

Austin has 800,000 cars on the road, so it's much less, but it makes sense given the Cybercabs would have higher utilization.

So what if we extrapolate the math to EVERY major US city?

15,000,000 Cybercabs.

How much revenue would this translate to for Tesla? Both in terms of the sale of the car, but also in terms of the fare revenue?

Sale of car: $420 billion, but spread over several years to reach this point.

Fare revenue: $736 billion PER YEAR....!

To put that into perspective, that is more annual revenue than Amazon, Walmart, Google, Microsoft, or NVIDIA.

It's 7x Tesla's current entire-company revenue base.

This reminds me of how SpaceX became a telecom business more than a rocket launch business, by revenue.

Tesla may become a ride-hailing business more than a car business, by revenue too.

And all this before we think about what Optimus could do.

Insane. 🤯

3.2万79(0.3%)5745053
X 原帖
MLMatt Loszak | Aalo Atomics
Matt Loszak | Aalo Atomics@MattLoszak科技与产品2.9万粉en
日常 3.9千

They may sound scary, but sodium reactors have some of the best passive safety properties in the game.

Sodium has more than 400 reactor-years of operational experience, and yet has never had a notable radiation release to the public.

Here's what keeps it safe:

1. Low pressure. The sodium pool operates near atmospheric pressure. There is no stored pressure energy to force radioactive material out.

2. High boiling point. Sodium operates around 450°C and boils at about 880°C. That is over 400 degrees of margin.

3. The coolant cannot drain away. The core sits in a double-walled pool, which sits in a reinforced guard vessel. Even with a leak, sodium stays around the core.

4. With metallic fuel (fast spectrum), the reactor slows itself down when it heats up. As fuel temperature rises, the chain reaction slows automatically. Even if the control rods did not insert, the reaction would still stop.

5. Decay heat is small. After shutdown, a 10 MWe core produces so little heat that the vessel can shed it to the surrounding air without pumps. This means you don't need backup power to keep the core cool, in a shut-down scenario. This was the challenge in Fukushima, where they lost backup power.

6. Accidents happen slowly. The sodium pool and the graphite hold a large amount of heat before temperatures rise much. In an accident, temperatures change over hours rather than seconds. This gives time to respond.

7. Sodium traps the most dangerous isotopes. Iodine and cesium bind chemically to sodium. In an accident, they stay in the pool instead of escaping to the air.

8. Cooling continues without power. Hot sodium rises and cool sodium sinks, so flow continues on its own if pumps fail. EBR-II demonstrated this at full power in 1986.

9. Small radioactive inventory. A 10 MWe reactor contains about 1% of the radioactive material in a large conventional plant.

10. The design lineage is proven. Sodium pool reactors have operated for decades. EBR-II ran for 30 years and passed deliberate tests where pumps were shut off and safety systems disabled at full power. The reactor shut itself down without human intervention.

2.2万98(0.4%)5167539
X 原帖
MLMatt Loszak | Aalo Atomics
Matt Loszak | Aalo Atomics@MattLoszak科技与产品2.9万粉en
日常 3.9千

A reactor vessel costs $1m to build. The balance of plant in the tens of millions.

Together, they produce power for 20 years with only a few refuelings, generating over $250M in revenue.

Magic-rock money-printer.

1.5万31(0.2%)2643216
X 原帖
MLMatt Loszak | Aalo Atomics
Matt Loszak | Aalo Atomics@MattLoszak科技与产品2.9万粉en
日常 3.9千

Nuclear energy is the most exciting thing you can work on today.

It's upstream of compute, human and planetary health, wealth and abundance.

It unlocks everything.

8.4千10(0.1%)2612814
X 原帖
MLMatt Loszak | Aalo Atomics
Matt Loszak | Aalo Atomics@MattLoszak科技与产品2.9万粉en
日常 3.9千

What will the impact of the new Texas administration be?

IMO it will be a good thing for nuclear, data centers, and the public.

Ppl just want new infrastructure (of any type) to be built responsibly. Clean air and not increasing utility prices are the main things.

Aalo is building nuclear that will be the best at this. No pollution, easy to "Bring Your Own Power" so you don't strain the grid, closed loop water cooling, etc.

It's been a wild past 2 weeks but our mission fortunately seems to have bipartisan support.

8.2千4(0.1%)62108
X 原帖
MLMatt Loszak | Aalo Atomics
Matt Loszak | Aalo Atomics@MattLoszak科技与产品2.9万粉en
日常 3.9千

Feeling v grateful for my cofounder Yasir. We have been through so much in building Aalo. Before we started the company, we spent over a year getting to know each other, going camping and hiking, traveling, etc. He's like a brother to me. No-one I'd rather be building this with @yasir_fission 👊

7.7千5(0.1%)150714
X 原帖
MLMatt Loszak | Aalo Atomics
Matt Loszak | Aalo Atomics@MattLoszak科技与产品2.9万粉en
日常 3.9千

Nuclear will be the best way to power behind the meter anything, and we’re going to prove it next year

I don't think many people realize how much behind-the-meter data center capacity is likely to come online in the coming years.

Today's numbers look relatively small. 3.8 GW operating and 6.2 GW under construction, according to our tracker at Cleanview.

But the pipeline is much bigger. There's about 125 GW of planned BTM capacity.

People are right to be skeptical that all of this comes online. But there's about 82 GW in the pipeline that looks pretty legitimate and likely. These projects have equipment, named tenants, experience, and/or hyperscaler backing etc.

Depending on how you cut the data, 20-30% of planned data center capacity is expected to come from BTM capacity.

Some of that is from temporary turbines. But a ton of it is planned to operate for 10+ years. Amazon's GW Ranch is 7.65 GW of nameplate gas capacity and has no plans to interconnect.

There's been a group of people who have been skeptical of these projects from the start and have convinced their audiences and followers they'll never be built.

I don't pretend to be able to predict the future. But if you think BTM data centers will be inconsequential, you should update your priors and consider listening to a few new podcasts.

6.8千11(0.2%)2031512
X 原帖
MLMatt Loszak | Aalo Atomics
Matt Loszak | Aalo Atomics@MattLoszak科技与产品2.9万粉en
日常 3.9千

Electricity used to only work for very short-range applications. For example, when Edison's Pearl Street station opened in 1882, it could only serve customers about a mile away.

So the first power plants sat inside city blocks, one per neighborhood, with boilers smoking right next to the offices they powered and lit. Because of this, air quality in cities started to get pretty bad.

Westinghouse solved this problem with alternating current. He proved it with a dramatic demonstration in 1896 where he harnessed Niagara Falls to generate electricity, lighting up Buffalo twenty miles away.

Transformers helped AC jump to high voltage, then cross a hundred miles with little loss, and step back down at your street. That capability of moving power far from where it is made is what allowed power generation to really get big. A gigawatt plant only makes sense if a gigawatt can leave the property and get distributed all over the place.

But now, data center demand is starting to change this. To avoid straining the grid and driving up utility power prices, hyperscalers are increasingly expected to "bring their own power". This will drive the deployment of many smaller generators (like gas or nuclear) being built much closer to these large loads, even on-site.

For the first time in decades, the way we generate and deploy electricity may get more decentralized, once again.

6.2千13(0.2%)106126
X 原帖
MLMatt Loszak | Aalo Atomics
Matt Loszak | Aalo Atomics@MattLoszak科技与产品2.9万粉en
日常 3.9千

Recently I heard an investor decided to pass on one of our competitors because Claude told them to.

I think this is a huge problem... for the same reason AI isn't funny (yet). Jokes and venture both involve "surprise", ie being non-consensus and right. Models are really good at providing summaries of what informed people already believe, but they're still somehow bad at these outlier topics.

This matters a lot because the future of humanity is largely determined by what gets investment, and what doesn't. We'd not only be missing out on great investments… we'd be giving up control over what we set out to accomplish as a species. I'm good with passing a lot of work to AI but I hope this is one thing we never fully delegate.

5.4千9(0.2%)7279
X 原帖
MLMatt Loszak | Aalo Atomics
Matt Loszak | Aalo Atomics@MattLoszak科技与产品2.9万粉en
日常 3.9千

The coolest chart I've ever played a role in creating.

This remains the largest fuel load any startup has brought to criticality, by a 10-100x margin.

Big things coming next year!

5.2千4(0.1%)8984
X 原帖
MLMatt Loszak | Aalo Atomics
Matt Loszak | Aalo Atomics@MattLoszak科技与产品2.9万粉en
日常 3.9千

AGI is here.

My friend recently met Canadian politician Doug Ford, but his eyes were closed for the photo.

Once upon a time this would have been a missed opportunity.

Not anymore.

4.1千3(0.1%)7017
X 原帖
MLMatt Loszak | Aalo Atomics
Matt Loszak | Aalo Atomics@MattLoszak科技与产品2.9万粉en
日常 3.9千

This will be one to watch

Mavria’s mission is to ensure that America delivers frontier infrastructure as quickly as we release frontier models.

Even though we founded Mavria in June, our story started back in 2025.  @adamblake, @nickporadek, and I spent over a year of our lives fighting inside the US government to help secure a better future.  In the modern world, all progress is just a wrapper on energy.  When imagination outpaces power delivery, the unyielding laws of physics always win.  Accelerating our society up the Kardashev scale meant, and still means, rethinking how we arrange atoms in the physical world, no different than rethinking the architecture behind AI models.  We found stagnation across nuclear, transmission, and scientific research, and we did our level best to help.  But there is always more work to do.  And in my life, I’ve always looked for gradients, places where I can best leverage my time and energy for the most impact.

Thankfully, I’ve had the privilege of learning how to deconstruct existing industrial processes and how we govern them alongside some of America’s most brilliant founders, leaders, thinkers, and builders.  That’s why, when Adam and Nick asked me to join them on something new, I said yes.  I knew that if we set out to build one of the most important industrial platforms of the 21st century, we would succeed.  Since starting, we’ve assembled a team of incredible people and supporters who share our vision, and, more importantly, our refusal to accept a different outcome.

Mavria starts, but by no means ends, with Terrain, a modular data center platform that will revolutionize AI infrastructure across the United States.  When we say Terrain will deploy in weeks, not months or years, we mean it.  Faster deployment means shorter time to tokens, but it also means less disruption to our host communities, the most important partners in our entire ecosystem.  In the same way we helped shift the dialogue around nuclear and the fuel cycle, Mavria will work with towns, counties, states, and the federal government to help change how average Americans feel about their future in a world of abundant intelligence.

Like nuclear, data centers get a bad rep (in some cases, deservedly so).  But, also like nuclear, America needs more data centers.  Growing up, watching the Jetsons, I always felt robbed of the nuclear-powered future that society promised to my parents.  What I thought was a failure of imagination turned out to be a failure of execution and loss of social license.  Yet, support for nuclear power increases the closer you get to an operating nuclear plant.  We see a world where data centers also get more popular the closer you get to Terrain.  We’ve learned the lesson; don’t stop building, just build better.

Scaling Terrain will allow us to develop the tools we need to tackle other critical infrastructure projects, too.  When we prove ourselves in data centers, Mavria will then manufacture products upstream from Terrain until adding more compute seems as simple as using it.  And then, we will build even more.  Keeping our promise means that America can keep its promise as the land of opportunity, a world where anyone with a dream, tenacity, and a refusal to believe in “no” can cobble together the resources to build something extraordinary.  It means that when my children watch the Jetsons, they will not long for a fumbled future.

Come help us keep our promise.  Come build the future with Mavria: t.co/GFa8ZKqFEz

3.9千3(0.1%)3621
X 原帖
MLMatt Loszak | Aalo Atomics
Matt Loszak | Aalo Atomics@MattLoszak科技与产品2.9万粉en
日常 3.9千

I'll always remember the moment I decided to quit my job and go all-in on company building.

I was working at a small engineering firm in the far West-end of Toronto. It was 2012, and I'd been considering quitting for months, ever since my first day.

But one day, on the drive home, I saw a billboard that looked like this (made with AI obviously but based on memory).

I still have no idea what they were advertising, but it said in plain white text on a pure black background: "Never wait for the ideal time to take a risk". I'm not making this up. I spoke to my boss the next day and told him I was leaving.

It's been a long journey. My first startup failed, and the next one we were able to sell, but I never cared much about the product we created. Aalo is the culmination of all my interests. It's the company that I've always dreamed of creating (but didn't think was possible, since I graduated right after Fukushima).

This same billboard message was still relevant In 2021 when I was considering if the time was right to start Aalo. It wasn't obvious. Countries were shutting down GW-scale nuclear plants globally. The odds of success seemed low. But I decided I'd much rather try and fail, than not try at all.

Building this company has been the most fun I've ever had in my life. There's nothing more fulfilling than working on super hard challenges with very smart people. I hope I can spend the rest of my life working on ever more challenging problems, with an even broader group of incredible and inspiring people.

If you're interested in joining us or considering getting into nuclear, or thinking about going off and taking a risk to start something new, don't wait for the perfect time. Just do it.

3.9千9(0.2%)67411
X 原帖
MLMatt Loszak | Aalo Atomics
Matt Loszak | Aalo Atomics@MattLoszak科技与产品2.9万粉en

Very excited to be working with Mo. He played a huge role in setting up the modern advanced reactor licensing pathways (53 and 57) and was previously the head of Advanced Reactor Licensing at NRC.

Welcome to the team, Mo!

We are proud to welcome Dr. Mo Shams to Aalo Atomics as Senior Vice President of Regulatory Affairs.

Mo is one of the people who rebuilt how America licenses advanced reactors, with 25 years of engineering and nuclear regulatory experience.

He previously served as Senior Director & Deputy of Licensing and Regulatory Affairs at TerraPower, where he led licensing activities for the Natrium and MCFR reactors. That work contributed to the NRC’s ahead-of-schedule issuance of a construction permit for the first commercial non-light-water reactor in the U.S. in more than 40 years.

At X-energy, his efforts advanced domestic and international licensing for the Xe-100 reactor, including the construction permit application at Seadrift and fast-follower licensing applications.

Prior to industry, Mo spent 17 years at the NRC, where he rose to Director of the Division of Advanced Reactors, Research & Test Reactors, and Medical Isotope Facilities. By helping lead the NRC’s advanced reactor program and modernizing its frameworks, he has directly supported America's advanced nuclear resurgence.

Mo also coached the teams that completed the Kairos Hermes construction permit reviews in less than half the standard schedule, led a first-of-a-kind collaboration with Canadian regulators that has become an international model for regulatory harmonization, and spearheaded the NRC’s efforts to enable efficient microreactor licensing.

Mo holds a PhD in Civil Engineering from Georgia Tech. At Aalo, he will lead regulatory strategy as we build on the criticality of our reactor at Idaho National Laboratory and bring the Aalo Pod to customers.

2.4千1(0.0%)5425
X 原帖
MLMatt Loszak | Aalo Atomics
Matt Loszak | Aalo Atomics@MattLoszak科技与产品2.9万粉en

John's background in People leadership is fantastic - he helped take Firefly public, led Talent Acquisition and HR at companies like AMD, GE, and more.

Welcome to the team, John! Excited to see what we can accomplish together.

We are proud to welcome John Termotto (@JohnTermotto) to Aalo Atomics as Senior Vice President, People.

John brings more than 30 years of experience scaling the talent engines behind innovative companies that bring transformative technology to market.

He joins us from Firefly Aerospace, where he spent 2.5 years scaling the organization through a historic period of growth, including directing readiness for one of the largest aerospace IPOs to date. He built the talent infrastructure to fuel rapid expansion and was a key member of the acquisition team for SciTec and Space-ng, where he led post-merger integrations to align people, systems, and operations.

Previously, John directed global HR technology deployment and talent innovation at GE Digital, including leading systems and talent integration for complex M&A transactions like Alstom and Baker Hughes. He also led human capital strategy and talent scaling across the institutional real estate and asset management platforms at Amherst and helped leading technology companies acquire executive leadership at Riviera Partners.

At Aalo, John will build the talent systems, organizational design, and performance culture required to support rapid headcount expansion and deliver clean, mission-critical nuclear technology to the world.

Welcome to the Aaloverse, John!

1.7千1(0.1%)1730
X 原帖